1 Jawahar S S K Huppari Modification of Turbine Back Pr Triveni make 550mm Model Power Turbine modified back pr.0.9kg to 1.3kg and maitained steam consumtion 12.5kg /kw
2 The Ghatapabha S S K Replacing Turbine Gear Box Internals Maxwatt Make 3MW Power Turbine Gear box out put shaft repalcing
3 Jai Hind Sugar (Gangapur Unit) Revaming of Damaged turbie Maison make 1.2MW Power turbine complete revamping work with replacing
4 Y M Krisna S S K Modification of Mechancial Governor Belliesh Make BD2 Model 3MW Power Turbine Mechnaical Governor convert to Electronic Governor
5 Arihanth Suagar Industries Replacing of Turbine Rotor All Stage Blades Bellies Make BD2 Model 2.5MW Power Turbine Rotor Blade Replaced with modified profile to achive good efficincy of turbine
6 Coromandel International Ltd., Ranipet Unit Modification of Turbine Power Triveni Make GAA Model Power Turbine Modifed 135kw to 200kw
7 Dhanuka Soya Pvt Ltd Modification of Turbine Power Triivei make 1030 model Power turbine modified to increase the power 1100kw to 1250kw with replacing all stages rotor and diapharms
8 Mohan Rao Shinde S S K - Arag Revamping of Accidented Turbine Triveni make 15MW Power turbine accidented on Dec'2021 and Delta replaced HP and LP Pedestal and New Rotor Shaft and Diapharagms.
9 Mohan Rao Shinde S S K - Arag Modifiction of Turbine Efficincy Bellies make SBP-350 Model 3MW x 2 Nos. Power Turbine Steam path modification work. Delta modifed and replaced rotor blades with welded diaphargm to redcued steam consmtion 13kkg/kw to 8.kg/kw
10 Laila Sugar Replacing of Main Nozzles ABB Make 2.5MW Power Turbine replaced main nozzle to increase the turbine efficincy